Span: 40m
Length: 126m
SURFACE AREA: 5040m2
ARENA OVERVIEW:
Production hall Brzozów
A production building with office and staff facilities, build for the timber and furniture production industry. The building is a composite structure, comprising a steel frame and reinforced concrete members, a two-bay production floor, and a gable roof, plus a boiler house. The office and staff building with more than 450m2 of usable floor area is a masonry and reinforced concrete structure with mono- and bi-directional reinforcement of the separating floor slabs, without any unnecessary beams or girders to provide neat and smooth surfaces.